All news

Canada

Canada ISED Publishes RSS-193 Issue 2 for Flexible Use Broadband Equipment

Canada Flag

04-NOV-26

On October 29, 2026, Innovation, Science and Economic Development Canada (ISED) published RSS-193 Issue 2, updating the certification requirements for flexible use broadband equipment operating in the 24.25–28.35 GHz and 37.6–40.0 GHz frequency bands.

The updated standard replaces Issue 1 and introduces technical requirements for additional frequency bands.
Key Requirements:
  • Scope: Covers base stations, fixed service equipment, and fixed and mobile subscriber equipment.
  • Modulation: Equipment must use digital modulation.
  • Frequency Stability: Occupied bandwidth must remain within the assigned frequency block or block group.
  • Power Limits: Maximum e.i.r.p. limits are 75 dBm/100 MHz for base stations and fixed service equipment, 55 dBm/channel for fixed subscriber equipment, and 43 dBm/channel for mobile subscriber equipment.
  • Unwanted Emissions: General limits of -5 dBm/MHz and -13 dBm/MHz apply, depending on the frequency offset. Additional limits apply in the 23.6–24.0 GHz band.
  • Labelling: Base stations operating in the 24.45–24.65 GHz band must include an indoor-use-only statement.

Transition Period:
A six-month transition period applies from the publication date, during which certification applications under either Issue 1 or Issue 2 will be accepted.
Manufacturers should review the updated requirements to ensure compliance with RSS-193 Issue 2 and the applicable provisions of RSS-Gen.
 View Full Regulatory Update

Eleos Compliance offer international RF, EMC, Safety and Green type approval services for radiocommunications products.

Eleos Compliance are a sustainable, values-based business combining extensive experience in the wireless homologation sector with outstanding project management.

For full support with your global market access requirements or regulatory intelligence needs please contact us at enquiries@eleoscompliance.com

Industry Updates

Latest News

Stay ahead of the rapid changes unfolding in RF and EMC regulation worldwide.

Browse all news
Abstract background for news article
South Africa
South Africa flag

South Africa ICASA Update on 5G-Only Device Type Approval

Manufacturers planning to launch 5G-only radio devices in South Africa face evolving ICASA Type Approval requirements as regulatory discussions continue.

24-NOV-26 Read more
Abstract background for news article
Paraguay
Paraguay flag

Extended Lead Times for CONATEL Type Approval

CONATEL type approval lead times in Paraguay are increasing due to IT system disruptions, limited processing capacity and an ongoing application backlog. Further delays are expected during the upcoming holiday period, affecting both ongoing and new applications.

24-NOV-26 Read more
Abstract background for news article
Zambia
Zambia flag

ZICTA Consultation on Revised Type Approval Guidelines

ZICTA sought industry feedback on proposed updates to Zambia's Type Approval Guidelines that introduce risk-based classification, expanded labelling, and revised customs rules.

24-NOV-26 Read more