All news

Paraguay

Extended Lead Times for CONATEL Type Approval

Paraguay Flag

24-NOV-26

Manufacturers seeking telecommunications equipment type approval in Paraguay should anticipate extended processing times due to ongoing operational challenges at the National Telecommunications Commission (CONATEL).

Over recent months, an increasing volume of homologation applications and limited processing capacity have contributed to longer certification timelines.

According to the latest information received from our local representative, recent IT system disruptions have further affected application processing, with some administrative activities temporarily being handled manually.

These circumstances, combined with the existing application backlog and anticipated reduced processing capacity during the upcoming holiday period, may result in further delays for both ongoing and new type approval applications.

Impact on Manufacturers

Manufacturers planning to introduce telecommunications equipment into the Paraguayan market are advised to:
  • Allow at least four months for the type approval process.
  • Submit applications well in advance of anticipated product launches.
  • Ensure all required technical and administrative documentation is complete before submission.
  • Consider additional flexibility in their certification and market access schedules.

Processing times remain subject to CONATEL's operational capacity and may vary depending on individual applications.

For further information or assistance with type approval in Paraguay, please contact the Eleos Compliance team.

Eleos Compliance offer international RF, EMC, Safety and Green type approval services for radiocommunications products.

Eleos Compliance are a sustainable, values-based business combining extensive experience in the wireless homologation sector with outstanding project management.

For full support with your global market access requirements or regulatory intelligence needs please contact us at enquiries@eleoscompliance.com

Industry Updates

Latest News

Stay ahead of the rapid changes unfolding in RF and EMC regulation worldwide.

Browse all news
Abstract background for news article
Paraguay
Paraguay flag

Extended Lead Times for CONATEL Type Approval

CONATEL type approval lead times in Paraguay are increasing due to IT system disruptions, limited processing capacity and an ongoing application backlog. Further delays are expected during the upcoming holiday period, affecting both ongoing and new applications.

24-NOV-26 Read more
Abstract background for news article
Zambia
Zambia flag

ZICTA Consultation on Revised Type Approval Guidelines

ZICTA sought industry feedback on proposed updates to Zambia's Type Approval Guidelines that introduce risk-based classification, expanded labelling, and revised customs rules.

24-NOV-26 Read more
Abstract background for news article
United States of America
United States of America flag

USA FCC Expands Satellite Connectivity for Ships, Planes, and Drones

The FCC has adopted new rules allowing Earth Stations in Motion (ESIMs) to operate in the 28.35–28.6 GHz band, expanding satellite broadband connectivity for ships, aircraft, drones and vehicles. The decision also removes previous restrictions on the 28.35–28.4 GHz portion of the band.

23-NOV-26 Read more