All news

Kenya

CAK Kenya switches to permanent type approval certificates for certain devices.

Kenya Flag

29-NOV-22

CAK stopped issuing 6 months provisional certificates for Low Power Devices, Switches and Routers. The Regulator instead grants final certificates for these types of RF and Telecom equipment

Even though the move has not been officially published, type approval applicants for above listed equipment can expect to be directly issued CAK permanent certificates which do not require renewal. For more information, please get in touch with your Eleos contact. 

Eleos Compliance offer international RF, EMC, Safety and Green type approval services for radiocommunications products.

Eleos Compliance are a sustainable, values-based business combining extensive experience in the wireless homologation sector with outstanding project management.

For full support with your global market access requirements or regulatory intelligence needs please contact us at enquiries@eleoscompliance.com

Industry Updates

Latest News

Stay ahead of the rapid changes unfolding in RF and EMC regulation worldwide.

Browse all news
Abstract background for news article
Algeria
Algeria flag

ARPCE and ANF New Regulatory Framework for Equipment Approval

Algeria has enacted Executive Decree No. 26-97, establishing updated procedures and technical requirements for the type approval of all radio and terminal equipment.

12-MAR-26 Read more
Abstract background for news article
India
India flag

India BIS Releases Implementation Guidelines for IS/IEC 62368-1:2023

The Bureau of Indian Standards has issued guidance on applying IS/IEC 62368-1:2023 to extended reality products, including AR, VR, and mixed reality devices. It also published instructions for transitioning to the updated standard on March 9, 2026.

12-MAR-26 Read more
Abstract background for news article
India
India flag

India DoT Sets Conditions for Activating the 5925–6425 MHz Band

India’s Department of Telecommunications has outlined the compliance steps required for holders of valid ETA approvals to activate devices in the 5925–6425 MHz band. A revised authorisation is required before the band can be enabled, with the process to be completed by April 5, 2026.

12-MAR-26 Read more