The draft, identified as ER No. TEC67222401, outlines the technical and safety parameters that SBCs must comply with before being placed on the Indian telecom network.
Scope of the Draft
- - EMI/EMC Requirements: Conducted and radiated emissions, electrostatic discharge, surges, voltage dips, and RF immunity in line with CISPR 32 and EN/IEC 61000 standards.
- - Safety Requirements: Compliance with IS 13252-1, IEC 60950-1, or IEC 62368-1.
- - Protocol Requirements: IPv4 (RFC 791), IPv6 (RFC 2460 / RFC 8200), SIP (RFC 3261), RTP/RTCP (RFC 3550 / 3551), TCP/UDP/SCTP (RFC 793 / 768 / 4960).
Interface Requirements:
- - 10/100/1000 BASE-T Ethernet – IEEE 802.3
- - 10/100 BASE-T Ethernet – IEEE 802.3
- - 10 G Optical Ethernet – IEEE 802.3ae
- - 1 G Optical Ethernet – IEEE 802.3z
Each interface section includes parameters such as link speed, auto negotiation, launch power, receiver sensitivity, and wavelength.
Public Consultation
The consultation process aims to ensure alignment with global standards and industry requirements.
Feedback can be submitted using the format provided in Annexure I of the draft document, available on the MTCTE portal
Next Steps for Manufacturers
New Applicants: May reference the draft ER for early compliance planning and product design readiness.
All Stakeholders: Should monitor TEC updates for publication of the final ER and effective date.
Eleos Compliance offer international RF, EMC, Safety and Green type approval services for radiocommunications products. Eleos Compliance are a sustainable, values-based business combining extensive experience in the wireless homologation sector with outstanding project management. For full support with your global market access requirements or regulatory intelligence needs please contact us at enquiries@eleoscompliance.com