All news

China

SRRC - MIIT issues new RFID and UWB regulations.

China Flag

27-MAY-24

The main changes in these two regulations compared with the former ones are listed below:

For RFID [Regulation No. (2024) 76]:
- 800MHz RFID band removed from its use.
- Specific 900MHz RFID band -divided into 3 different frequency ranges with different requirements- has been enabled for RFID.
- The spurious emission limit on some specific frequency has been modified (TX mode).
- New test item "Receiver blocking limit" added.

For UWB [Regulation No. (2024) 77]:
- The 7163-8812MHz band is enabled for its use by ultra-wideband (UWB) radio transmitting equipment -equipment with a transmit signal bandwidth (bandwidth -10dB) of not less than 500MHz-, mainly used in short-distance high-speed wireless data communication, positioning, ranging, perception and other fields.
- The remaining parts of the 5.925-10.6GHz band that were covered by the old regulation are now specified as band edge emission and their requirements will vary depending on the band segment (5.925-7.125GHz; 7.125-7.136GHz; 8.812-9GHz; 9-10.6GHz).
- UWB equipment is prohibited from being used within 1 km around radio astronomy observatories and on aircraft equipment (including unmanned aircraft).
- The spurious emission limit on some specific frequency has been modified (TX mode).
- The spurious emission for the general frequency range has been decreased (TX mode).
- The spurious emission for the general frequency range has been decreased (RX and IDLE modes).

The new RFID regulation will come into force on 1 November 2024, while the new UWB regulation will be on 1 August 2025. Existing regulations [RFID: Regulation No. (2007) 205 & UWB: Regulation No. (2008) 354] will be both withdrawn, allowing existing compliant equipment to apply for type-approval or its extension until these dates respectively. After the corresponding dates, only RFID/UWB equipment that complies with the new criteria will be type-approved, and already certified devices can continue to be used until they are removed from service.

For further information, please do not hesitate to contact us.

Original sources:
- MIIT - Regulation No (2024) 76.
- MIIT - Regulation No (2024) 77.

Eleos Compliance offer international RF, EMC, Safety and Green type approval services for radiocommunications products.

Eleos Compliance are a sustainable, values-based business combining extensive experience in the wireless homologation sector with outstanding project management.

For full support with your global market access requirements or regulatory intelligence needs please contact us at enquiries@eleoscompliance.com

Industry Updates

Latest News

Stay ahead of the rapid changes unfolding in RF and EMC regulation worldwide.

Browse all news
Abstract background for news article
Brazil
Brazil flag

Brazilian RoHS Public Consultation

Public consultation regarding a proposed resolution that introduces restrictions on hazardous substances in electrical and electronic products sold in Brazil

15-AUG-25 Read more
Abstract background for news article
Indonesia
Indonesia flag

Indonesia Launches Public Consultation on National AI Roadmap and Ethics Guidelines

The consultation focuses on two key documents intended to guide the country's AI development: Draft White Paper on the National Artificial Intelligence (AI) Roadmap: This document outlines a strategic framework to accelerate the adoption of AI in an inclusive, sustainable, and responsible manner. It will serve as the foundation for future national policies on AI governance. Draft Concept of AI Ethics Guidelines: This document aims to complement existing ethical frameworks, providing a comprehensive set of principles to guide the responsible development and implementation of AI technologies.

15-AUG-25 Read more
Abstract background for news article
India
India flag

India BIS Updated Guidelines for IS 16270:2023 Amendment No. 1 on Solar PV Battery Cells

BIS issues compliance rules for Amendment No. 1 to IS 16270:2023, impacting all secondary cells and batteries used in solar photovoltaic off-grid systems, with full implementation due by 8 December 2025.

14-AUG-25 Read more