All news

Canada

Canada ISED Revises 2500–2690 MHz Band Plan for Unpaired TDD Use

Canada Flag

28-SEP-26

Innovation, Science and Economic Development Canada (ISED) has published its decision on revisions to the 2500–2690 MHz band plan.
The current mix of paired FDD and unpaired TDD spectrum will eventually be replaced by a fully unpaired TDD configuration. Under the new band plan, the spectrum will be divided into 38 unpaired 5 MHz blocks, which can be combined to support wider bandwidths.
Until formal transition dates are confirmed, both the existing band plan and the new unpaired plan will remain applicable. Equipment operating under the new band plan must operate on a no-interference, no-protection (NINP) basis in relation to systems using the existing band plan.
ISED also plans to update the relevant technical standards, including RSS-199 and SRSP-517, to reflect the revised arrangement.
Existing deployment requirements attached to current licences will be removed. However, licence holders will still be required to demonstrate that the spectrum is being put to use under future conditions and timelines that will be set out in a later consultation.
ISED has also confirmed that the transition will not begin in 2028. Detailed transition arrangements will be subject to further consultation, with transition dates expected to be no earlier than 2033.
View Full Regulatory Update

Eleos Compliance offer international RF, EMC, Safety and Green type approval services for radiocommunications products.

Eleos Compliance are a sustainable, values-based business combining extensive experience in the wireless homologation sector with outstanding project management.

For full support with your global market access requirements or regulatory intelligence needs please contact us at enquiries@eleoscompliance.com

Industry Updates

Latest News

Stay ahead of the rapid changes unfolding in RF and EMC regulation worldwide.

Browse all news
Abstract background for news article
Canada
Canada flag

Canada ISED Consults on SRSP-522 for 24 & 28 GHz Bands

Innovation, Science and Economic Development Canada (ISED) is seeking comments on SRSP-522, Issue 2, which proposes updated technical requirements for non-competitive local licensed fixed, mobile, and flexible-use broadband systems in the 24.25–25.1 GHz and 27.5–28.35 GHz bands. The consultation introduces technical rules for the 24.25–25.1 GHz band. Comments are due by 15 January 2027.

21-OCT-26 Read more
Abstract background for news article
Japan
Japan flag

MIC Draft Frequency Reorganization Action Plan

Japanese Ministry of Internal Affairs and Communications (MIC) in Japan has opened the following public consultation for the Frequency Reorganization Action Plan (FY2026 edition)

16-OCT-26 Read more
Abstract background for news article
Togo
Togo flag

New Device Homologation Procedures in Togo

Togo's regulatory authority, ARCEP, has introduced updated requirements for the type approval of electronic communication equipment and the certification of radio equipment installers.

16-OCT-26 Read more