All news

Canada

ISED open Public Consultations on 960 MHz Band and RF Exposure.

Canada Flag

25-AUG-22

The Department of Innovation, Science and Economic Development Canada (ISED) has opened the following 2 public consultations:

SRSP-300-GEN- issue 1 : “General Technical Requirements for Fixed Point-to-Point Radio Systems Operating in Frequency Bands above 960 MHz”. The consultation sets out the general technical requirements for the efficient use of frequency bands above 960 MHz by point-to-point radio systems.

The public consultation can be found here : https://www.rabc-cccr.ca/srsp-300-gen-issue-1-general-technical-requirements-for-fixed-point-to-point-radio-systems-operating-in-frequency-bands-above-960-mhz/

Comments must be submitted by October 24, 2022.

GL-08 : Guidelines for the Preparation of Radio Frequency (RF) Exposure Compliance Reports for Radiocommunication and Broadcasting Antenna Systems. The document provides guidelines and establishes minimum parameters required to be included in RF exposure compliance reports prepared by proponents and operators of all radiocommunication and broadcasting antenna installations.

The public consultation can be found here : https://www.rabc-cccr.ca/guidelines-for-the-preparation-of-radio-frequency-rf-exposure-compliance-reports-for-radiocommunication-and-broadcasting-antenna-systems-gl-08/

Comments are due no later than October 11, 2022.

Eleos Compliance offer international RF, EMC, Safety and Green type approval services for radiocommunications products.

Eleos Compliance are a sustainable, values-based business combining extensive experience in the wireless homologation sector with outstanding project management.

For full support with your global market access requirements or regulatory intelligence needs please contact us at enquiries@eleoscompliance.com

Industry Updates

Latest News

Stay ahead of the rapid changes unfolding in RF and EMC regulation worldwide.

Browse all news
Abstract background for news article
India
India flag

India BIS Updated Guidelines for IS 16270:2023 Amendment No. 1 on Solar PV Battery Cells

BIS issues compliance rules for Amendment No. 1 to IS 16270:2023, impacting all secondary cells and batteries used in solar photovoltaic off-grid systems, with full implementation due by 8 December 2025.

14-AUG-25 Read more
Abstract background for news article
Brazil
Brazil flag

ANATEL Resolution No. 780/2025

ANATEL Resolution No. 780/2025: New Rules for Telecom Product Certification in Brazil

05-AUG-25 Read more
Abstract background for news article
United States of America
United States of America flag

FCC Updates Delegation Rules

The FCC finalizes rule changes to clarify and standardize delegated authority among its Bureaus and Offices, allowing them to adopt certain rule amendments without prior notice and comment under specific APA exemptions.

05-AUG-25 Read more