All news

Canada

Technical Requirements for Land Mobile and Fixed Radio Services

Canada Flag

12-FEB-24

The Department of Innovation, Science and Economic Development Canada is seeking comments on the consultation of SRSP-506, issue 3 (draft), “Technical Requirements for Land Mobile and Fixed Radio Services, Including Broadband Systems, Operating in the Bands 896-901 MHz and 935-940 MHz”. SRSP-506 issue 3 sets forth the minimum technical requirements for the purpose of efficient spectrum utilization for land mobile and fixed point-to-point systems (narrowband systems), operating in the bands 896-901MHz and 935-940 MHz, as well as broadband systems in rural and remote areas in the bands 897.5-900.5 MHz and 936.5-939.5 MHz.
 
The following are the main changes:
  • Enabled broadband systems in rural and remote areas operating in the bands 897.5-900.5 MHz and 936.5-939.5 MHz.
  • Incorporated technical rules and select requirements for equipment to facilitate the deployment of broadband systems.
  • Updated the channel loading guidelines to align with document GL-04.
  • Other editorial updates and improvements have been made throughout the document.
 
 
Comments are due no later than April 19, 2024, through the following link:
 
For more information, please get in touch.


Eleos Compliance offer international RF, EMC, Safety and Green type approval services for radiocommunications products.

Eleos Compliance are a sustainable, values-based business combining extensive experience in the wireless homologation sector with outstanding project management.

For full support with your global market access requirements or regulatory intelligence needs please contact us at enquiries@eleoscompliance.com

Industry Updates

Latest News

Stay ahead of the rapid changes unfolding in RF and EMC regulation worldwide.

Browse all news
Abstract background for news article
India
India flag

India BIS Updated Guidelines for IS 16270:2023 Amendment No. 1 on Solar PV Battery Cells

BIS issues compliance rules for Amendment No. 1 to IS 16270:2023, impacting all secondary cells and batteries used in solar photovoltaic off-grid systems, with full implementation due by 8 December 2025.

14-AUG-25 Read more
Abstract background for news article
Brazil
Brazil flag

ANATEL Resolution No. 780/2025

ANATEL Resolution No. 780/2025: New Rules for Telecom Product Certification in Brazil

05-AUG-25 Read more
Abstract background for news article
United States of America
United States of America flag

FCC Updates Delegation Rules

The FCC finalizes rule changes to clarify and standardize delegated authority among its Bureaus and Offices, allowing them to adopt certain rule amendments without prior notice and comment under specific APA exemptions.

05-AUG-25 Read more