All news

Indonesia

Delays to SDPPI approval due to COVID-19

Indonesia Flag

15-MAR-20

SDPPI have issued a public letter announcing measures being taken at the SDPPI lab in order to prevent the spread of COVID-19.

The public letter Plt.BBPPT/BBPPT.31/KOMINFO/03/2020 introduces a number of measures, including a stop to all physical testing of equipment for SDPPI approval. All equipment with ongoing testing for SDPPI approval has now been postponed. Manufacturers are still able to apply for approval via the paperwork only approach, provided that the test reports are issued by an SDPPI-accredited laboratory.

Other measures include home working for SDPPI staff and the cancellation of public events and activities of SDPPI staff.

We are expecting to see other similar measures worldwide and will keep everyone updated as we see measures introduced.

Eleos Compliance offer international RF, EMC, Safety and Green type approval services for radiocommunications products.

Eleos Compliance are a sustainable, values-based business combining extensive experience in the wireless homologation sector with outstanding project management.

For full support with your global market access requirements or regulatory intelligence needs please contact us at enquiries@eleoscompliance.com

Industry Updates

Latest News

Stay ahead of the rapid changes unfolding in RF and EMC regulation worldwide.

Browse all news
Abstract background for news article
Japan
Japan flag

Singapore and Japan to Mutually Recognise IoT Cybersecurity Labelling Schemes

Singapore and Japan have signed a Memorandum of Cooperation to mutually recognise each other’s IoT cybersecurity labelling schemes, making it easier for certified smart devices to enter both markets. The arrangement streamlines certification for manufacturers, strengthens cybersecurity standards, and boosts consumer confidence. It takes effect on 1 June 2026 and covers devices such as smart home assistants, alarm systems, and IoT hubs

01-APR-26 Read more
Abstract background for news article
India
India flag

India TEC Issues Exemption Addendum for Selected Parameters/Interfaces of ERs under MTCTE

TEC has issued an addendum granting a generic exemption from submission of test reports for specified parameters and interfaces under MTCTE up to 30.06.2026 or until further orders, subject to submission of a Self-Declaration of Conformity as per the enclosed annexure.

01-APR-26 Read more
Abstract background for news article
Singapore
Singapore flag

Singapore Cybersecurity Labelling Reqts. for Residential Routers

The Cyber Security Agency of Singapore is raising mandatory cybersecurity requirements for residential routers to CLS Level 2 by the end of 2027.

01-APR-26 Read more