All news

Argentina

ENACOM: Revised Version of Testing Standard for SRDs

Argentina Flag

30-MAR-22

 ENACOM in Argentina has recently released an update ENACOM-Q2-60.14 V21.1 for the SRD testing standard which replaces the current standard ENACOM-Q2-60.14 V20.1. The official document is dated from March 8th, 2022.
 
There are a few main changes to mention:
 
New low frequency bands have been added to the standard, namely: 
0.490 – 1.705 MHz (maximum allowed power of 24000/f(kHz) μV/m at 30 m); 
1.705 – 30 MHz (maximum allowed power of 30 μV/m @ 30 m).
 
There is a transition period of 90 calendar days which allows new as well as ongoing requests to be accepted with test reports issued under the previous standard ENACOM-Q2-60.14 V20.1.
 
Products which are based on the previous resolution 555/2021 and need to be renewed do NOT have to be tested again, provided that the original test report shows compliance with the limits established in the new regulation.

For a copy of the regulation, please get in touch with your Eleos contact. 

Eleos Compliance offer international RF, EMC, Safety and Green type approval services for radiocommunications products.

Eleos Compliance are a sustainable, values-based business combining extensive experience in the wireless homologation sector with outstanding project management.

For full support with your global market access requirements or regulatory intelligence needs please contact us at enquiries@eleoscompliance.com

Industry Updates

Latest News

Stay ahead of the rapid changes unfolding in RF and EMC regulation worldwide.

Browse all news
Abstract background for news article
Canada
Canada flag

Canada ISED Ends RSS-216 Issue 2 Transition Period

The one-year transition period allowing use of RSS-216 Issue 2 has officially ended. Starting September 4, 2025, only RSS-216 Issue 3 is accepted for certification of wireless power transfer devices in Canada.

15-SEP-25 Read more
Abstract background for news article
Nepal
Nepal flag

Impact of Political Unrest on Regulatory Approvals in Nepal

This September, Nepal witnessed an uprising known as Gen-Z Revolution, demanding end to corruption and lifting ban on social media such as Facebook, WhatsApp, etc. Government offices are burned down; other Government offices are shut down completely. As such, significant delays in getting the approvals are expected.

11-SEP-25 Read more
Abstract background for news article
Canada
Canada flag

Canada ISED Seeks Public Consultation on RSS-252, Issue 3

ISED (Canada) is consulting on proposed RSS-252 Issue 3, setting certification requirements for license-exempt C-V2X On-Board Units (OBUs) in the 5895–5925 MHz band for intelligent transportation systems. Comments close November 10, 2025.

10-SEP-25 Read more