Global Regulatory Intelligence

Access comprehensive worldwide regulatory data

Start Free Trial
Japan
In Force

Technical Requirements for the Outdoor Use of 920 MHz Band Beam Wireless Power Transmission Systems" as Part of "Technical Requirements for Beam Wireless Power Transmission Systems

Technical requirements (partial report) for enabling outdoor, limited-power operation of 920 MHz band beam wireless power transmission (WPT) systems in Japan.

Type

Standard

Last Updated

Related Documents

Technical Requirements for the Outdoor Use of 920 MHz Band Beam Wireless Power Transmission Systems" as Part of "Technical Requirements for Beam Wireless Power Transmission Systems

Stay Ahead of Regulatory Changes

Get full access to our comprehensive database of global regulations, real-time updates, and expert analysis.

Sign Up Now