Eleos Logo Eleos Compliance
Portal Contact
Public Regulatory Brief

Global Regulatory Intelligence

Verified compliance intelligence and regulatory updates curated by Eleos Compliance engineers.

Request Full Hub Access
Bahamas Regulation In Force

ECS 10/2026: Statement of Results and Final Decisions – Implementation of a 5G Regulatory Framework in The Bahamas

Affects: Certification Process Cybersecurity Pricing Requirements for Recieve Only Devices Safety Spectrum Management Testing 5G 800 MHz Band 71 / n71 Band n78

Topics

5G Frequency Allocation Type Approval

Requirement Type

Spectrum Allocation Technical Requirements

Products Included

5G NR Equipment Cellular Mobile Terminals Base Stations

Last Updated

Scope and Focus

The Utilities Regulation and Competition Authority (URCA) of The Bahamas has published its Statement of Results and Final Decisions (Document ECS 10/2026) regarding the "Implementation of a 5G Regulatory Framework in The Bahamas." The regulation establishes the framework for the initial assignment and deployment of fifth-generation (5G / IMT-2020) mobile networks, defining designated frequency bands, technical coexistence measures, deployment obligations, network security requirements, and rules for private 5G networks and small-cell installations.

Impact on Radio Device Certification and Equipment Deployment:

  • Equipment Type Approval: All radio access installations, including small cells that may fall outside the scope of existing tower rules, remain strictly subject to applicable equipment type-approval and safety requirements.
  • Band Compatibility: Network operators and applicants must demonstrate that their proposed network equipment and user devices are compatible with the specific frequency blocks assigned (n71 and n78).
  • RF / EMF Exposure Compliance: All 5G network equipment and associated radiofrequency emissions must comply with internationally recognized Electromagnetic Field (EMF) exposure limits, specifically those established by the International Commission on Non-Ionizing Radiation Protection (ICNIRP).
  • Cybersecurity & Supply-Chain Risk Management: Although certification to a specific security standard is not mandatory for initial spectrum assignment, licensees must implement risk-management measures for equipment suppliers and vendors. This includes vendor due diligence, secure equipment and software lifecycle management (patching and end-of-life processes), and alignment with international standards (e.g., ISO/IEC 27001, 3GPP security specifications, GSMA guidance, NIST SP 800-161 Revision 1, TIA SCS 9001, and the use of Software Bills of Materials [SBOMs]). Equipment presenting unmitigated material risks to network security may be restricted from deployment in critical network functions.

Permitted Radio Bands and Technical Parameters

URCA has confirmed the following initial spectrum configurations and technical conditions for 5G deployment:

  • Low-Band Spectrum – Band n71 (600 MHz):
    • Designated Use: Wide-area and indoor 5G coverage (including 5G Fixed Wireless Access [FWA]).
    • Configuration & Bandwidth: Two paired Frequency Division Duplex (FDD) assignments of 2 × 10 MHz each:
      • Pair A: 617–627 MHz (downlink) and 663–673 MHz (uplink).
      • Pair B: 642–652 MHz (downlink) and 688–698 MHz (uplink).
    • Technical Parameters: Operates under a primary Mobile Service allocation (ITU Radio Regulations footnotes 5.293 and 5.308A), subject to cross-border coordination under Radio Regulations No. 9.21 and protection of broadcasting services in neighbouring countries.
  • Mid-Band Spectrum – Band n78 (3.5 GHz / C-Band):
    • Designated Use: High-capacity initial 5G deployment.
    • Configuration & Bandwidth: Two contiguous Time Division Duplex (TDD) assignments of 100 MHz each:
      • Block A: 3400–3500 MHz.
      • Block B: 3600–3700 MHz.
    • Technical Parameters: Subject to guard bands, block-edge spectral emission masks, power limits, and TDD synchronisation requirements to prevent interference between adjacent networks and protect Fixed-Satellite Service (FSS) operations in the adjacent 3700–4200 MHz band. Block A (3400–3500 MHz) is also subject to ITU Radio Regulations footnotes 5.431A and 5.431B (including cross-border power flux-density limits and No. 9.21 coordination).Specific usable bandwidth and block-edge masks will be finalized in the upcoming 5G Spectrum Band Plan.
  • Existing IMT Spectrum (e.g., 800 MHz):
    • Designated Use: URCA will consider requests from existing licensees to deploy 5G services using their existing IMT spectrum assignments, including the 800 MHz band, on a technology-neutral basis, subject to the National Spectrum Plan (NSP) 2026–2029.
  • Network Capability Benchmarks:
    • Equipment and network designs must support a minimum baseline capability of at least 100 Mbps downlink and 50 Mbps uplink in designated urban/high-demand areas, and an end-to-end latency of 30 ms or better during initial Non-Standalone (NSA) deployment.
    • All 5G base station sites must maintain a minimum backup power capability of at least 8 hours.

Exemptions and Restrictions

  • Excluded and Deferred Frequency Bands:
    • 3300–3400 MHz: Excluded from the initial 5G assignment due to coexistence and coordination concerns with radar systems operating in neighbouring countries.
    • 3700–3800 MHz & 3800–4200 MHz: Excluded from the initial 5G spectrum assignment to protect incumbent Fixed-Satellite Service (FSS) operations.
    • 700 MHz Band: Will not be refarmed for the initial 5G release, as it remains essential for existing 4G LTE coverage.
    • High-Band Spectrum (mmWave – 26 GHz and 28 GHz): Not prioritised or included in the initial 5G assignment process. The 28 GHz band is specifically restricted from immediate terrestrial 5G commitment due to incumbent and prospective satellite uses.
  • Airport Coordination Zones and Restrictions:
    • To protect aircraft radio altimeters operating in the 4.2–4.4 GHz band, URCA will establish coordination or exclusion zones around major airports (including Lynden Pindling International Airport and Grand Bahama International Airport).
    • Licensees must coordinate with URCA and the Civil Aviation Authority Bahamas (CAAB) before activating 5G base stations within these zones and comply with technical mitigations such as transmission power limits, antenna tilt restrictions, and guard bands.
  • Small-Cell Deployment Notifications:
    • While certain small-cell installations on utility poles or buildings may fall outside the definition of a tower under the Electronic Communications Tower Rules, they are subject to a risk-based notification requirement if they exceed specified power thresholds, are located near sensitive locations (schools, hospitals, airports), or involve large-scale deployments.
  • Private 5G Networks (S-NPNs) & D2D/NTN Restrictions:
    • There is no automatic entitlement to permanent Premium Spectrum for Standalone Non-Public Networks (S-NPNs). Direct access to Premium Spectrum for standalone private 5G networks is restricted to temporary, controlled trials.
    • Any Direct-to-Device (D2D) or Non-Terrestrial Network (NTN) use of n71 spectrum requires prior URCA authorisation via a separate regulatory process.
  • Receive-Only FSS Earth Stations:
    • Receive-only Fixed-Satellite Service (FSS) earth stations remain exempt from formal licensing or registration requirements during the initial 5G assignment process, though URCA may consider a broader equipment registration framework in a future workstream.

In-Country Testing Procedures and Requirements

  • Controlled Trials for Private 5G and Emerging Technologies:
    • URCA, with Ministerial approval, has authorised the temporary use of Premium Spectrum for controlled trials of standalone private 5G networks (S-NPNs) and targeted mmWave deployments.
    • These in-country trials are designed to evaluate technical feasibility, propagation, spectrum coexistence, interference management, and network security in Bahamian conditions.
    • Trials will be facilitated through URCA's established licensing mechanisms or the forthcoming "Innovation Reef" framework (Regulatory Framework for Controlled Testing in the Electronic Communications Sector).
  • Post-Deployment Verification and EMF Site Assessments:
    • Licensees are required to conduct in-country EMF compliance assessments for all new 5G sites to verify adherence to ICNIRP limits and must submit these results to URCA upon request.
    • URCA will conduct post-deployment conformity and compliance verification of 5G networks through field inspections, representative location testing, technical assessments, and independent security audits.

Labeling and Signage Requirements

The document does not specify physical labeling requirements for individual consumer radio devices. However, for deployed 5G network infrastructure and base station equipment, licensees are mandated to display appropriate RF/EMF safety signage at 5G sites where necessary to inform and protect the public.

Relation to Other Regulations

This regulation does not repeal or replace existing regulations; rather, it establishes a new framework that operates alongside and relies upon the following existing legislative and regulatory instruments:

  • Concludes Consultation: It represents the Statement of Results and Final Decisions for the Consultation Document on the Implementation of a 5G Regulatory Framework in The Bahamas (ECS 01/2026).
  • Incorporates by Reference into National Spectrum Plan: It clarifies that the primary Mobile Service allocation under ITU Radio Regulations footnote 5.293 is incorporated by reference into the National Frequency Allocation Table (NFAT) under the National Spectrum Plan 2026 – 2029 (NSP 2026 - 2029).
  • Maintains Without Amendment: It confirms that the Electronic Communications Tower Rules, 2016 will remain in effect without amendment for the initial 5G rollout, and retains the formula-based pricing methodology established in the Review of Radio Frequency Spectrum Pricing (ECS 01/2016).
  • Complements Existing Frameworks: It operates alongside the Communications Act, 2009, the Electronic Communications Sector Policy 2024–2027 (ECSP 2024-2027), the Outage Reporting and Mitigation Regulations for the Electronic Communications Sector (ECS 07/2024), the Disaster Management Regulations for the Electronic Communications Sector, and the regulatory framework for satellite-based electronic communications services (ECS 07/2026) pending future reviews of the Infrastructure Sharing Regulations, the Guidelines for Cybersecurity of Electronic Communications Networks and Services, and the forthcoming Electromagnetic Field (EMF) Exposure Regulations.

Attached Documents & Source Files

ECS 10/2026: Statement of Results and Final Decisions – Implementation of a 5G Regulatory Framework in The Bahamas

Author / Agency: Utilities Regulation and Competition Authority (URCA)

Published: 2026-11-24
Language: English

Key Regulatory Timeline & Dates

Feb 05, 2026
Commenting Opens Publication date of the Consultation Document on the Implementation of a 5G Regulatory Framework in The Bahamas (ECS 01/2026).
May 31, 2026
Commenting Deadline Extended deadline for stakeholder responses to the Consultation Document (initially 2026-04-08).
Nov 24, 2026
Date Published Publication date of the Statement of Results and Final Decisions (ECS 10/2026).

Stay Ahead of Global Regulatory Changes

Eleos Compliance delivers proactive regulatory monitoring, standard gap analysis, and type approval management across 150+ countries.