This regulation reconfigures the 3.98–4.2 GHz band to expand terrestrial wireless flexible use for 5G services in the contiguous United States. It establishes technical rules, power limits, and interoperability requirements while ensuring coexistence with incumbent satellite services and aeronautical radio altimeters.
Regulation
This regulation, issued by the Federal Communications Commission (FCC) under GN Docket Nos. 18–122 and 25–59, reconfigures the 3.98–4.2 GHz band (Upper C-band) to expand terrestrial wireless flexible use in the contiguous United States. It repurposes 160 megahertz of spectrum for mobile services, primarily to support 5G and next-generation wireless ecosystems. This action impacts radio device manufacturers by incorporating these frequencies into the "3.7 GHz Service," necessitating compliance with updated technical and coexistence rules designed to protect incumbent satellite services and adjacent-band aeronautical radio altimeters.
The regulation establishes the following band plan and technical requirements for terrestrial operations:
The reconfiguration and new terrestrial licensing rules apply only to the contiguous United States (CONUS) and the District of Columbia. The following areas are specifically excluded from terrestrial wireless flexible use licensing at this time, preserving the status quo for Fixed Satellite Service (FSS) and Fixed Service (FS) allocations:
Additionally, while the 4.14–4.16 GHz band is allocated for mobile services, no service rules have been established for its use other than its function as a guard band.
Manufacturers must adhere to the equipment authorization procedures specified in 47 CFR Part 2 and the service-specific rules in Part 27. Key requirements include:
The regulation requires that all devices comply with standard FCC equipment authorization labeling. While no unique label text is introduced by this specific order, devices must be authorized under 47 CFR Part 27, which necessitates the application of an FCC Identifier (FCC ID) and the standard compliance statements required for intentional radiators. Supporting documentation for performance benchmarks must include electronic coverage maps and propagation models used to certify reliable signal coverage.
This regulation modifies the following rules and previous orders:
Date of Entry into Force
Effective date for the majority of the final rule provisions.
Compliance Deadline
Deadline for all new mobile and portable stations to be fully interoperable across the entire 3.7–4.14 GHz band.
Date Published
Published in the Federal Register.
Get full access to our comprehensive database of global regulations, real-time updates, and expert analysis.
Sign Up Now